Footnote 137
For example, in a fee acquisition of a portion of the property for inclusion in a wildlife refuge without any substantial construction, the description of the government’s project could probably be brief. If, on the other hand, the government’s acquisition was a permanent easement through the parcel for construction of a flood control levee with associated temporary construction easements, a detailed description of the government’s project may be necessary. Such a description might include such things as height of the levee; width at the base and at the top of the levee; degree of side slopes of the levee; finish material (e.g., riprap, seeded soil) of the slopes; any provisions for access over the levee; any provisions for drainage; duration of temporary construction easements and the use to which the government will put the easement areas during construction; anticipated condition of the temporary construction easement areas at termination; and anticipated impact on future flooding, as compared to historical flooding.